Entrances to the port

Terminal in numbers

General information

Quayside
450 m

Sea depth
8 to 11 m

Berths
3

Storage capacity

Warehouse with moisture regulating devices and temperature ranging from 0 to +20°C
25.800 m2

Refrigerated spaces for deep freezing down to -18°C
2.000 m2

Banana ripening facility (for palleted cargo and loose boxes)
1.800 t/month

Machines and equipment

Reefer electrical outlets
244

Mobile shore cranes
2

Unloading (daily capacity)

Break-bulk
1.000 t/day

Pallets
2.000 pallet/day

Vessels at the time
3 ships simultaneously

Un-stuffing containers and reloading trucks
180 ctn/day

Many years of experience in handling highly perishable goods together with experienced staff provide fast, reliable and high-quality services at ourReefer Terminal.

The terminal is equipped with modern computer-controlled storages, where the temperature, humidity and air circulation can be regulated. Thus the quality of goods does not change, even when stored for a long period of time.

Product groups Product origin
Bananas Ecuador, Columbia
Citruses and other fruit Israel, Egypt, South America, South Africa
Vegetable Egypt, Israel
Dairy products Various
Frozen meat and fish Various

Additional services

  • sorting,
  • ripening and palleting of bananas,
  • weighing,
  • selecting,
  • packaging,
  • labelling, etc. 

Transit times

Organisation of activities at the terminal and good connections enable the following transit times for the distribution of goods:

Milan
Vienna
0,5 day
Belgrade
Budapest
Prague
Berlin
Warsaw
Rotterdam
Paris
Frankfurt
1 day
Kopenhagen
London
2 days
Moscow 4-5 days

Contacts

Roman Božič
Head of PC General cargo terminal
Milena Jerman
Sales & Marketing
Milka Kleva
Sales manager
Luka Kraljić
Operations manager